Experienced ERP consultants who work at your Sharjah premises to map processes, check what your current system can really do, and plan the next step.
Sharjah, UAEOn-site and remote ERP support
Sharjah manufacturers, wholesalers and service firms can get ERP consulting from UAE ERP Experts, whose Dubai-based consultants hold workshops on site in the industrial areas, Al Sajaa, SAIF Zone or Hamriyah. Engagements cover ERP health checks of existing systems, requirements and platform selection, manufacturing costing reviews, project assurance and data readiness for e-invoicing and corporate tax.
An ERP consultant in Sharjah is often called in at one of two moments. The first is before buying: a manufacturer or wholesaler knows the current setup is not working but is unsure what to replace it with. The second is after buying: an ERP was implemented a year or two ago, people still keep side spreadsheets, and management wants to know whether to fix it or start again. Both questions need someone who will look at how the work is really done.
Sharjah businesses tend to be hands-on. Owners know every customer, stores are busy, and the accounts team is small. Our consultants work around that by holding short, focused workshops at your premises in the industrial areas, Al Sajaa, SAIF Zone or Hamriyah, and by observing the actual flow of goods: receiving at the gate, issuing to production, packing and dispatch. We travel from our Dubai office for these sessions and do the write-up remotely.
You leave the engagement with clear answers: what your processes should look like, which requirements matter most, and whether your current system can deliver them. If you already run an ERP, our ERP health check approach is often the starting point; if you are choosing a new one, the work feeds directly into selection.

We hold workshops and walk-throughs in these areas, usually grouping several sessions into one visit.
Each engagement starts with a specific business question rather than a software wish list.
Differences between system stock and physical counts usually come from unrecorded issues, returns or unit conversions. A consultant traces each movement type and recommends controls before any new system is chosen.
Many Sharjah factories price from a rule of thumb because material, labor and overhead are not linked to production orders. Consulting work defines a costing method the ERP can apply consistently.
An existing system may be poorly configured rather than unsuitable. A structured review compares the cost and risk of reconfiguring against a fresh implementation.
Traders selling to hundreds of workshops and contractors need credit limits, aging and collection follow-up. The consultant designs the credit process and the reports that support it.
Customer master data, invoice fields and entity structures often need cleanup before new tax requirements apply. A readiness review lists the gaps in plain terms.
Choose the model that matches the size of the decision. Every option has a written scope and a defined deliverable.
A short review of an existing system: configuration, user practices, data quality and reports, ending with a prioritized list of fixes.
Workshops, a requirements document and scripted demos to help you choose between platforms with confidence.
A focused look at bills of materials, routings, scrap and overhead allocation for factories that need reliable product costs.
A block of consultant hours used as needed for questions, design reviews and vendor meetings over several months.
Independent checkpoints on a project being delivered by another vendor, including design reviews and go-live readiness.
A review of tax codes, invoice layouts and customer data against UAE VAT and e-invoicing needs, to be confirmed with your tax advisor.
What our consultants usually focus on, and the platforms that often come up in the discussion.
| Business type | Consulting focus | Platforms often considered |
|---|---|---|
| Metal fabrication or steel workshop | Job costing, material issue control, offcut tracking | Odoo, ERPNext |
| Plastics or packaging factory | Recipes, scrap and regrind, machine output reporting | Odoo, ERPNext, Dynamics 365 |
| Building materials trader | Unit conversions, delivery scheduling, credit control | Odoo, Zoho |
| Auto parts wholesaler | Part catalog structure, alternates, warehouse picking | Odoo, ERPNext |
| SAIF Zone trading entity | Intercompany with mainland, currencies, landed cost | Dynamics 365 Business Central, Odoo |
| Private school or academy | Fee billing, staff payroll, budgeting | ERPNext, Zoho |
We implement Zoho, Odoo, ERPNext, Dynamics 365 and custom ERP. Consulting advice remains our honest view even when the best fit is a product we do not implement.
Ranges are indicative. A health check is usually the shortest; a full selection with demos takes longest.
Durations are typical ranges; your plan is agreed after discovery.
We agree the business question, the engagement model, who attends and what the final deliverable will be.
Workshops and floor walk-throughs at your Sharjah premises, plus a review of system data or sample documents.
Remote analysis of findings, process maps, data samples and, where relevant, platform fit.
An on-site session with owners and managers to walk through findings, options and recommended next steps.
Optional retained hours or a move into implementation with the same consultants.
Go deeper into implementation, industry guides and partner pages for Sharjah.
We configure the system for the rules UAE businesses report against, and test it before go-live.
General information, not tax or legal advice. Confirm current requirements with the FTA, MOHRE or your advisor. See all UAE compliance guides.
Nearby areas, free zones and emirates we serve from Sharjah Media City and our Dubai team, alongside Sharjah.
Official sources and references
Facts on this page were checked against these sources in October 2026. Rules change, so confirm current requirements before acting.
Still have a question? Our consultants are happy to help.
Ask an ExpertYes. A health check looks at configuration, data quality, how users actually work and which reports are trusted. You receive a prioritized list of fixes and an honest view on whether reconfiguring is enough or a replacement is justified.
We implement Zoho, Odoo, ERPNext, Dynamics 365 and custom ERP, and we disclose that at the start. If your requirements point elsewhere, for example to SAP or NetSuite, we tell you, and we can still help write requirements for that tender.
Workshops usually need two to three hours per department, plus time from one coordinator to gather documents and data samples. We schedule sessions around production shifts and busy delivery periods.
Our office is in Dubai. Consultants travel to Sharjah for workshops, walk-throughs and presentations, and do analysis and documentation remotely.
Yes, if you choose us to implement. Continuity helps because the consultant already knows your processes. If you choose another vendor, we hand over the requirements and process maps so they can use them.
Related Solutions
Related Industries
Related ERP Platforms
Call +971 55 145 3265 or email contact@uaeerpexperts.com to describe your question and pick a workshop date.
Sharjah Media City (Shams), Sharjah, UAETeam in Dubai, serving all seven emirates