Marine Industry

ERP for Marine Companies in the UAE

For ship repair yards, boat builders, marine engineering and vessel service companies that need job costing per vessel and tight control of spares.

Free consultation

Get a Free ERP Consultation

Tell us a little about your business. A consultant will reach out within one business day.

  • No obligation
  • Vendor-neutral advice
  • Your data stays private
Quick answer Updated October 2026 · Reviewed by UAE ERP Experts consultants

What ERP suits ship repair and marine engineering companies in the UAE?

An ERP for marine companies in the UAE is built around the vessel. Ship repair yards, boat builders and marine engineering firms keep vessel master records with engines and service history, convert repair estimates into work orders and variation orders, and cost labour, materials and subcontract work per job. Spare parts are tracked by part number, serial number and location.

  • Every job, part fitted and invoice is linked to the vessel's master record.
  • Additional dry-dock work is raised as a variation order and sent for owner approval.
  • Approved variation orders flow into the final invoice for the vessel owner.
  • Dock and berth slots can be planned using project and resource planning views.

Marine work is job work, vessel by vessel

An ERP for marine companies in the UAE is built around the vessel. Whether you repair tugs and supply boats in Dubai Maritime City, build fibreglass boats in Ajman, service yachts at a marina or provide marine engineering from Hamriyah or Fujairah, every piece of work is tied to a specific hull, engine or system, and every vessel owner expects a clear estimate and a clear final bill.

Marine jobs are hard to cost. A dry docking can start with a defined scope and grow by dozens of variation items once the hull is out of the water. Labour comes from several trades, materials range from steel plate to imported engine parts, and subcontractors handle blasting, painting or class surveys. If estimates, timesheets and purchases sit in different files, the yard often finds out it lost money after the vessel has sailed.

This page focuses on marine services, repair and building. If you operate as a ship agent, liner agent or NVOCC, see our separate page on ERP for shipping companies, which covers port calls and voyage accounting.

Marine work is job work, vessel by vessel
  • Vessel master records with equipment, engines and service history
  • Repair estimates that convert to work orders and variation orders
  • Labour, materials and subcontract cost per job, per vessel
  • Spare parts tracked by part number, serial and location
The Challenge

Problems marine businesses face

These issues are typical for UAE yards and marine service companies.

Scope creep in dry dock

New defects are found once the vessel is opened up. If extra work is not captured as approved variation orders, the owner disputes the final invoice.

Long-lead spare parts

Engine and propulsion parts may come from Europe or Asia with weeks of lead time. Without visibility of open orders and stock, vessels sit idle waiting for a part.

Multi-trade labour costing

Welders, fitters, electricians and painters all book time to the same vessel. Manual timesheets make it hard to see real labour cost against the estimate.

Yard and berth planning

Slipway, dry dock and berth slots are limited. Overlapping bookings or overruns push back the next vessel and its revenue.

Boat building cost control

New builds use bills of materials and staged payments. Without milestone billing linked to progress, cash flow suffers.

Service history gaps

When a vessel returns, technicians cannot see what was done last time, which parts were fitted or what warranty applies.

ERP Workflow

Ship repair job flow

A typical repair or refit job, from enquiry to closing the vessel file.

  1. 1Owner enquiry
  2. 2Survey and estimate
  3. 3Approval and work order
  4. 4Docking
  5. 5Repairs and variations
  6. 6Undocking and delivery
  7. 7Final invoice
  8. 8Warranty record

One shared database: every step updates stock, finance and reports in real time.

Recommended Modules

ERP modules for marine companies

The right mix depends on whether you repair, build or service vessels, but these modules form the core.

Vessel and equipment register

Each vessel with its IMO or registration number, owner, engines, generators and installed equipment.

Estimating and quotations

Estimates built from labour rates, material lists and subcontract quotes, with versions as scope changes.

Projects and work orders

Repair jobs broken into work packages per trade, with variation orders approved by the owner.

Timesheets and labour

Trade-wise time booked to vessel and work package from the yard floor via tablet or kiosk.

Inventory and spares

Marine spares, consumables and steel tracked by part number, serial and storage location.

Procurement

Purchase requests from jobs, supplier quotes and import orders with expected arrival dates.

Manufacturing for new builds

Bills of materials and work centres for hulls, fit-out and outfitting stages.

Field service

Technicians sent to vessels at anchor, in port or at marinas, with job reports and parts used.

Odoo Maintenance corrective request form for a work center - ERP for Marine Companies UAE
Odoo Maintenance corrective request form for a work center (real product screenshot). Image: Odoo S.A. (Odoo documentation), CC BY-SA 4.0 from the official product documentation.
Dashboard Preview

Marine maintenance and repair dashboard

What a yard manager or service manager checks every morning.

  • Vessels in dock or at berth with planned departure dates
  • Estimate versus actual cost per job
  • Variation orders waiting for owner approval
  • Critical spares on order and expected arrival
  • Recurring service visits due for client vessels

Platform fit by marine business type

We implement each of these platforms. The best fit depends on the kind of marine work you do.

Platform fit by marine business type
Business typeOften a good fitWhy
Ship repair yard or refit facilityOdooProjects, timesheets, purchase, inventory and maintenance share one database, and variation orders are easy to model.
Boat builderERPNext or OdooBoth offer bills of materials, work orders and milestone billing suited to new builds.
Marine engineering and service companyZoho One or OdooField service, CRM and inventory handle technician visits and parts sales without heavy setup.
Larger marine group with several entitiesDynamics 365Project accounting, multi-currency purchasing and consolidation across companies.
Unique yard planning needsCustom ERPBerth and dock scheduling rules can be built as a custom planning module on top of a standard core.
UAE Compliance

Tax and compliance for marine companies

Marine activities can have specific VAT treatment, so tax setup needs care.

VAT on vessel-related supplies

UAE VAT law includes specific provisions for certain means of transport and related goods and services, including some qualifying vessels. Whether zero-rating applies depends on the vessel and the supply. Set up tax codes with your tax advisor and keep the supporting evidence in the ERP.

Imports and customs

Imported spares carry customs duty and import VAT. ERP links customs declarations and landed costs to the purchase so the true part cost reaches the job.

Corporate tax

Yards in free zones may be Qualifying Free Zone Persons subject to conditions. Accurate job and entity-level accounting supports that assessment; confirm with your tax advisor.

Payroll and e-invoicing

Yard workers are paid through WPS with gratuity accrued under UAE Labour Law. E-invoicing through Accredited Service Providers is phased in from 2027; check the latest Ministry of Finance and FTA guidance.

General information, not tax or legal advice. Rules change; confirm current FTA, MOHRE and Ministry of Finance guidance with your advisor.

Business Benefits

Benefits marine companies aim for

Typical goals, not guaranteed outcomes.

Fewer billing disputes

Approved variation orders and documented work make final invoices easier for owners to accept.

Shorter waits for parts

Open orders and stock levels are visible, so critical spares are ordered early.

Accurate job margins

Labour, materials and subcontracts are captured against each vessel as the work happens.

Better yard utilization

Dock and berth plans show overruns early, helping the next vessel arrive on time.

Implementation Timeline

Rollout timeline for a marine company

Typical ranges for a single-site yard or service company; new build operations take longer.

Durations are typical ranges; your plan is agreed after discovery.

  1. Discovery

    1-3 weeks

    Walk the yard, review estimates, timesheets, stores and how variations are approved today.

  2. Configuration

    4-7 weeks

    Set up vessel records, estimating templates, projects, inventory and procurement.

  3. Data migration

    1-3 weeks

    Load vessels, customers, spares catalogue, stock balances and open jobs.

  4. Pilot job

    2-4 weeks

    Run one or two live repair jobs end to end before moving all work across.

  5. Go-live

    Ongoing support

    Train yard supervisors and storekeepers and review margin reports after the first month.

UAE Compliance Built In

UAE regulations covered in every ERP for Marine Companies UAE project

We configure the system for the rules UAE businesses report against, and test it before go-live.

General information, not tax or legal advice. Confirm current requirements with the FTA, MOHRE or your advisor. See all UAE compliance guides.

Serving the UAE

ERP for Marine Companies UAE across all seven emirates

On-site workshops in Dubai, Abu Dhabi and Sharjah, and remote or on-site delivery across the Northern Emirates and free zones.

Official sources and references

Facts on this page were checked against these sources in October 2026. Rules change, so confirm current requirements before acting.

FAQs

ERP for marine companies: FAQs

Still have a question? Our consultants are happy to help.

Ask an Expert
Can we keep a full service history for each vessel?

Yes. Every job, part fitted, technician report and invoice is linked to the vessel record. When the vessel returns, the team sees past work and warranty status straight away.

How are variation orders handled?

Additional work is raised as a variation against the main job, priced from your rates and sent to the owner for approval. Approved variations flow into the final invoice so nothing is missed.

Can the ERP plan dock and berth slots?

Standard project and planning tools can show vessels against dock or berth resources. Where yard rules are complex, we build a simple planning view tailored to your facility.

Is marine VAT handled automatically?

The system applies whatever tax codes you configure, but deciding which supplies qualify for special treatment is a tax question. We set up the codes and evidence fields with your tax advisor.

Do you serve marine companies outside Dubai?

Yes. Our office is in Dubai and we work on-site and remotely with companies in Sharjah, Ajman, Ras Al Khaimah, Fujairah and Abu Dhabi.

Free Consultation

Cost every vessel job accurately

Talk to our Dubai team about ERP for your yard, boat building or marine service business.

Location

Sharjah Media City (Shams), Sharjah, UAETeam in Dubai, serving all seven emirates

Free consultation

Send us your requirements

  • No obligation
  • Vendor-neutral advice
  • Your data stays private
Chat with an ERP expert